12.4.12

Muddy Hell

Remind me again why we are building a house? Progress is very slow. Roof is on, some windows in and some electrical done. Plumbing roughed in and a few other bits and pieces. Frustrating to see everything so close but the cliched so far away.

15.2.12

We're In!

No, not the house, but a caravan.

With two kids starting school at Coolamon, and little jobs on the house to be done in the afternoons, we have acquired a van to spend some nights on site.

Which means The Lad and Dad (and sometimes Hurricane V) are off on the bus to Wagga in the mornings.

The kids are loving the space outside and the novelty of the caravan. They have also been putting the trampoline they got for Xmas to good use.

More news soon.

Photobucket


15.1.12

We're Fixing A Hole

The Big Bad Wolf made an unfortunate visit to our house of steel and foam on Tuesday night/Wednesday morning, huffing and puffing and blowing down 6 panels.

As they were the 6m high panels, it amounts to about 45 square metres of back wall, but these things happen.

Replacements have been ordered and it will probably set us back about a week, although we can just keep plugging away on the garage wing and the bedroom wing and get them done ahead of schedule.

Oh well.



Photobucket

1.1.12

There's a house with some walls........

Oops, with the holiday season, and other minor stuff like building a house, it really is hard to find the time to blog.

After the crane came out on the 20th and 21st, we managed to put up 31 of the big panels which make up the central section of the house.

Ideally, we would have got all 36 up but not everything went to plan (like it ever does!).

Crane will be back next week when hopefully we can have the entire roof erected over a couple of days.

The first panel is lifted by the crane.

... and put in place


.......the 2nd panel


......the inside
.....end of day 2, 3 panel short finish the centre
......end of day one
...the inside looking up into the mezz level and down into the kitchen
Photobucket