Survey pegs in and ready to go. |
Little high rise cities of plumbing to cater for the kitchen, laundry, bathroom and three ensuites. |
Pipes for one of the kids' ensuites |
Downstairs bathroom waste and water. |
Trenches and mesh for lounge/dining area. |
Footings ready for concrete. |
More footings to be poured. |
And more. |
Yes ... footings filled! |
The boys take advantage of the one of the piles of dirt removed during excavation. |
Strip footing for verandah columns. |
Brickwork wasn't part of the original plans, but due to the slope of the block, the builder and concreter decided it was better than a huge chunk of concrete. |
The brickwork changes allowed us to step down into the garage section of the house. |
Filled, pest treated, water-proofed and meshed in preparation for the pour. |